1. Katameya Ain Sokhna Road

The cutting, backfilling and tamping works were completed and a base layer 40 cm thick and two asphalt layers 11 cm thick, 7.11 km long and 1.23 m wide, consisted of 5 traffic lanes and a bicycle lane in one direction. The two directions were implemented with a total width of 2.46 m Katameya - Ain Sukhna Road Project 2016 AD (value of executed works: 58 million pounds).

2. El Galala Road

The levels of the Galala road card have been modified, the cutting, backfilling and tooth sectors have been implemented, the Galala Road linking area with the June 30 axis has been implemented. Marble City Roads Projects in Galala (value of executed works: 80 million pounds).

3. The Path of El Galala Service

The cutting, backfilling and tooth sectors were executed with a thickness of 40 cm for the Galala service road with a length of 5 km and a width of 16 m, and the tunnel area was implemented to connect the service road to the Galala road El Galala Tourist City Roads Projects (Value of Executed Works: 25 million EGP).

4. June 30 Axis

5 sectors were implemented in the June 30 axis A project to develop and raise the efficiency of the Ismailia-Cairo desert road from Saad El-Shazly axis to the June 30 axis. 2020 AD (value of executed works: 100 million pounds). A road project to extend the 30th of June axis from Suez to Ismailia (Value of executed works: 70 million pounds)

5. The administrative capital

10 sectors have been implemented in the administrative capital Administrative Capital Roads Projects (2016 AD - 2020 AD) (The Administrative Capital Circle - Diplomatic Quarter Roads - Eastern Connection Road - Al Narjis Housing Road - Al Yasmeen Housing Road - The Road to Dealing with the Public with Strategic Leadership - Embassies Neighborhood Road - 11th Al Shaab Square Road - Presidential Park - Jawhara Capital) (Value of executed works: 400 million pounds)

6. Zafarana Road (Air Defense)

7. The MR3 Route at the base of the Highkestep

Road projects in the military city of Highkestep (value of executed works: 24 million pounds).

8. The residential neighborhood road in the city of Galala

Residential Neighborhood Road Project in El Galala City (value of executed works: 42 million pounds).

9. Land reclamation project in Beni Suef - Minya

Settlement and replacement work has been carried out for 9 pieces Road projects in the governorates of Beni Suef and Minya (value of executed works: 42 million pounds).

10. Fish farms (A, B) and Farma road projects in East Port Said

(Value of executed works: 420 million pounds)

11. Industrial Zone Roads Projects in East Tafria

(2015 to 2020 ) (Value of executed works: 300 million pounds)

12. Road projects (Toshka - East Oweinat)

(value of executed works: 70 million pounds).

13. Project to develop and raise the efficiency of Upper Egypt Freeway

(value of executed works: - 40 million pounds)

14. A road project to extend the Umm Qamar link to the Suez-Cairo Desert Road

2020 AD (the value of the executed works: 40 million pounds).

15. Road projects in the middle ring sector

from the highway to the Cairo-Fayoum Road (Value of executed works: 36 million pounds)

16. Road projects in the east of the new city of Ismailia

(Value of executed works: 28 million pounds).

17.Abu Al-Daraj city

A road construction project(the value of the executed works: 25 million pounds).

18. Road projects at East Port Said Naval Base

(Value of executed works: 14 million pounds).

19. Road projects in the new city of El Alamein

(value of executed works: 10 million pounds).

20. Oyoun Moussa Road Work Project

Sharm El Sheikh (value of executed works: 10 million pounds)

  • Client

    The Engineering Authority of the Armed Forces

  • Consultant

    Dar Al-Handasah,Systra,FACB,Dr.Khaled Kandel

  • Location

    All Over, Egypt

  • Size

    ---------

  • Year Completed

    Done

  • Categories

    Earth working