Dredging of Lake Marriot
The Engineering Authority of the Armed Forces has started implementing a plan to develop and develop Lake Mariout, as part of the state’s strategy in developing the northern lakes. relative to 3 metres,
The project included several axes, foremost of which is the deepening of the lake using modern dredgers and excavators for the first time, which leads to deepening the lake and raising the water level in it from 30 centimeters to about 3 metres, thus maintaining the raising of the water level throughout the year as well as preserving the water coming from the drain The castle inside the lake, in addition to the benthic sediment removal and disinfection works.
-
Client
The Engineering Authority of the Armed Forces
-
Consultant
Suez Canal Authority
-
Location
Alexandria, Egypt
-
Size
65,000 SF
-
Year Completed
Under Construction
-
Categories
Dredging